Featured Projects

Grid Modernization across Canada and the United states- from operational strategy and platform selection to integration, testing and deployment


Expanding Access to DER Hosting-Capacity Data

Region: Northeast USA
Timeline: Q2 2024 | April–December 2024
Status: Completed


​

northeast-usa-hosting-capacity-HD.jpg

Led discovery for a public hosting-capacity platform through DER interconnection and siting research, interviews with developers, aggregators, utilities, and regulators, and collaborative design sessions that translated stakeholder needs into product requirements and an enhancement roadmap.

mountain-west-usa-roadmap-HD.jpg


Connecting the Utility Technology Landscape Through 2030

Region: Mountain West USA
Timeline: Q2 2024 | June 2024–March 2025
Status: Completed


​

Created a phased roadmap and updated architecture across AMI, CIS, MDMS, SCADA, OMS/ADMS, DERMS, GIS Utility Network, asset management, work management, and materials management—documenting integrations and data flows to sequence modernization through 2030 and beyond.

western-canada-scada-HD.jpg


Preparing Distribution SCADA for a DER- Ready Future

Region: Western Canada
Timeline: Q1 2025 | January – July 2025
Status: Completed


​

Defined the future-state Distribution SCADA strategy required for a planned ADMS/DERMS deployment. The engagement documented system, data, network, field-device, people, and process constraints; benchmarked six major North American utilities; and produced a ten-year roadmap for secure, scalable, DER-ready operations.

atlantic-canada-der-roadmap-HD.jpg


Creating a Practical Roadmap for DER Integration

Region: Atlantic Canada
Timeline: Q2 2025 | June 2025 – April 2026
Status: Completed


​

Developed an integrated DER roadmap covering acquisition mechanisms, centralized and decentralized DERMS architectures, utility- and customer-owned behind-the-meter assets, partner coordination, benefit-cost analysis, portfolio prioritization, governance, roles, and KPIs.

south-central-usa-oms-HD.jpg


Designing the Future of Outage Operations

Region: South-Central USA
Timeline: Q4 2025 | October 2025 – Present
Status: In Progress


​

Assessing the current state, designing the future state, and defining business requirements across seven OMS subprocess areas—including outage detection, crew dispatch, switch-order management, and integrations—for a transition from the existing network-management platform to a new OMS/DMS platform

northeast-usa-der-lab-HD.jpg


Building the Lab Foundation for DER Integration

Region: Northeast USA
Timeline: Q4 2025 | November 2025 – Present
Status: In Progress


​

Defining the ADMS/DERMS architecture needed to test DER inverter technology, validate device communications, and integrate selected devices into the broader OT environment. The engagement also supports a Grid Modernization Technology Lab for repeatable testing and commissioning.

midwest-usa-dso-HD.jpg


Evaluating DSO Consolidation Across 17 Cooperatives

Region: Midwest USA
Timeline: Q4 2025 | December 2025 – April 2026
Status: Completed


​

Evaluated four operating models across a 17-member cooperative network, mapping 188 capabilities and 16 technology platforms. The study also benchmarked 12 G&T cooperatives and developed cost-allocation methods and risk registers addressing NERC CIP, governance, and workforce transition.

central-canada-adms-derms-HD.jpg


Defining the ADMS-DERMS Roadmap and Selecting the Right Platform

Region: Central Canada
Timeline: Q1 2026 | January 2026 – Present
Status: In Progress


​

Providing technical leadership for a three-phase initiative spanning strategic roadmap development, RFP creation, and vendor evaluation. A performance-based grid-modernization framework across eight core modules connects operational outcomes to functional requirements, procurement, and technology selection.

southwest-usa-adms-HD.jpg


Upgrading the ADMS Core for the Next Release

Region: Southwest USA
Timeline: Q1 2026 | January 2026 – Present
Status: In Progress


​

Supporting the ADMS 3.8-to-3.11 upgrade through program mobilization, an integrated multi-workstream plan, cross-dependency management, analysis of net-new requirements, and a procurement-led systems-integrator RFP and selection process.

atlantic-canada-flisr-HD.jpg


FLISR Project

Region: Atlantic Canada
Timeline: Q2 2026 | May 2026 – Present
Status: In Progress


​

Providing strategic guidance and technical oversight for a funded FLISR pilot on an ADMS 3.8 platform. The pilot is validating automated fault location, feeder isolation, and service restoration to reduce outage duration and improve distribution reliability.

mid-atlantic-usa-derms-HD.jpg


Engineering Confidence into DERMS Deployment

Region: Mid-Atlantic USA
Timeline: Q3 2026 | July 2026 – Present
Status: In Progress


​

Leading test readiness, planning, execution, tracking, and reporting across Factory Acceptance Testing, Site Acceptance Testing, Site Integration Testing, and User Acceptance Testing to verify DERMS functions, integrations, and operating workflows before production deployment.

Map.png

Northeast USA
Hosting Capacity Analysis Platform Design

 

Mid-Atlantic USA

DERMS Program Testing and Integration

 

Midwest USA
Distribution System Operations Strategy

 

Mountain West USA
Grid Modernization Roadmap

​

Southwest USA
ADMS Upgrade Program

 

South-Central USA
OMS Replacement Program

Western Canada
SCADA Upgrade Strategy

​

Central Canada
ADMS and DERMS Roadmap & Vendor Selection

​

Atlantic Canada
DER Integration and Reliability