Featured Projects

Grid Modernization across Canada and the United states- from operational strategy and platform selection to integration, testing and deployment

Expanding Access to DER Hosting-Capacity Data

Led discovery for a public hosting-capacity platform through DER interconnection and siting research, interviews with developers, aggregators, utilities, and regulators, and collaborative design sessions that translated stakeholder needs into product requirements and an enhancement roadmap.

northeast-usa-hosting-capacity-HD.jpg

Region: Northeast USA
Timeline: Q2 2024 | April–December 2024
Status: Completed

mountain-west-usa-roadmap-HD.jpg

Connecting the Utility Technology Landscape Through 2030

Created a phased roadmap and updated architecture across AMI, CIS, MDMS, SCADA, OMS/ADMS, DERMS, GIS Utility Network, asset management, work management, and materials management—documenting integrations and data flows to sequence modernization through 2030 and beyond.

Region: Mountain West USA
Timeline: Q2 2024 | June 2024–March 2025
Status: Completed

western-canada-scada-HD.jpg

Preparing Distribution SCADA for a DER- Ready Future

Defined the future-state Distribution SCADA strategy required for a planned ADMS/DERMS deployment. The engagement documented system, data, network, field-device, people, and process constraints; benchmarked six major North American utilities; and produced a ten-year roadmap for secure, scalable, DER-ready operations.

Region: Western Canada
Timeline: Q1 2025 | January – July 2025
Status: Completed

atlantic-canada-der-roadmap-HD.jpg

Creating a Practical Roadmap for DER Integration

Developed an integrated DER roadmap covering acquisition mechanisms, centralized and decentralized DERMS architectures, utility- and customer-owned behind-the-meter assets, partner coordination, benefit-cost analysis, portfolio prioritization, governance, roles, and KPIs.

Region: Atlantic Canada
Timeline: Q2 2025 | June 2025 – April 2026
Status: Completed

south-central-usa-oms-HD.jpg

Designing the Future of Outage Operations

Assessing the current state, designing the future state, and defining business requirements across seven OMS subprocess areas—including outage detection, crew dispatch, switch-order management, and integrations—for a transition from the existing network-management platform to a new OMS/DMS platform

Region: South-Central USA
Timeline: Q4 2025 | October 2025 – Present
Status: In Progress

northeast-usa-der-lab-HD.jpg

Building the Lab Foundation for DER Integration

Defining the ADMS/DERMS architecture needed to test DER inverter technology, validate device communications, and integrate selected devices into the broader OT environment. The engagement also supports a Grid Modernization Technology Lab for repeatable testing and commissioning.

Region: Northeast USA
Timeline: Q4 2025 | November 2025 – Present
Status: In Progress

midwest-usa-dso-HD.jpg

Evaluating DSO Consolidation Across 17 Cooperatives

Evaluated four operating models across a 17-member cooperative network, mapping 188 capabilities and 16 technology platforms. The study also benchmarked 12 G&T cooperatives and developed cost-allocation methods and risk registers addressing NERC CIP, governance, and workforce transition.

Region: Midwest USA
Timeline: Q4 2025 | December 2025 – April 2026
Status: Completed

central-canada-adms-derms-HD.jpg

Defining the ADMS-DERMS Roadmap and Selecting the Right Platform

Providing technical leadership for a three-phase initiative spanning strategic roadmap development, RFP creation, and vendor evaluation. A performance-based grid-modernization framework across eight core modules connects operational outcomes to functional requirements, procurement, and technology selection.

Region: Central Canada
Timeline: Q1 2026 | January 2026 – Present
Status: In Progress

southwest-usa-adms-HD.jpg

Upgrading the ADMS Core for the Next Release

Supporting the ADMS 3.8-to-3.11 upgrade through program mobilization, an integrated multi-workstream plan, cross-dependency management, analysis of net-new requirements, and a procurement-led systems-integrator RFP and selection process.

Region: Southwest USA
Timeline: Q1 2026 | January 2026 – Present
Status: In Progress

atlantic-canada-flisr-HD.jpg

FLISR Project

Providing strategic guidance and technical oversight for a funded FLISR pilot on an ADMS 3.8 platform. The pilot is validating automated fault location, feeder isolation, and service restoration to reduce outage duration and improve distribution reliability.

Region: Atlantic Canada
Timeline: Q2 2026 | May 2026 – Present
Status: In Progress

mid-atlantic-usa-derms-HD.jpg

Engineering Confidence into DERMS Deployment

Leading test readiness, planning, execution, tracking, and reporting across Factory Acceptance Testing, Site Acceptance Testing, Site Integration Testing, and User Acceptance Testing to verify DERMS functions, integrations, and operating workflows before production deployment.

Region: Mid-Atlantic USA
Timeline: Q3 2026 | July 2026 – Present
Status: In Progress

Map.png

Western Canada
SCADA Upgrade Strategy

​

Central Canada
ADMS and DERMS Roadmap & Vendor Selection

​

Atlantic Canada
DER Integration and Reliability

Northeast USA
Hosting Capacity Analysis Platform Design

 

Mid-Atlantic USA

DERMS Program Testing and Integration

 

Midwest USA
Distribution System Operations Strategy

 

Mountain West USA
Grid Modernization Roadmap

​

Southwest USA
ADMS Upgrade Program

 

South-Central USA
OMS Replacement Program